17/11/2023: Once more ready to drill with hardrock
After tasting the bedrock at a depth of 57.8 meters, a new borehole had to be drilled to adjust for an optimal inclination. Two days of destructive drilling were enough to be back on track and the corrected borehole has already been secured with cement. While waiting the curing, our on-site scientific team is actively analyzing the initial crystalline cores retrieved at the interface between the alluvial deposits and bedrock.