...and the 500m have been crossed!
The crossing of the 500 m depth level has been celebrated in the early afternoon, when the 6th core out of today's 7 has seen light. The pulling ability of the rig is now fully functional. The current bottom depth is 504.3 m, drilling resumes on Monday. Until then, a geophysical logging program is on the agenda, to evaluate the position of the borehole with respect to the geological structure more precisely.