12/04/2024: Final depth!
Final depth has been reached at DT-1A! More than satisfactory lithological and structural variations, time constraints and some technical difficulties with the rig, contributed to the decision to stop the drilling at 909.5 meters. While the shipping of cores is being prepared, now on-site operations are all focused to prepare the borehole logging activities in the next weeks.